Go to content
Viscaria_260126_0254.jpg

Kiruna

Viscaria

Outside Kiruna, preparations are underway for the reopening of the Viscaria copper mine, a extensive project with a planned first delivery in 2028. With an estimated production of around 26,000 tonnes of copper per year, the mine is expected to become one of Europe’s largest copper producers. The total investment amounts to approximately 7 billion kronor and the operation is expected to create a workforce of 250-300 people.

Cable ladder solutions customised for demanding environments

In preparation for the planned production start, a new water treatment facility is now being built to purify the water found in the former mine and ensure sustainable operation of the business.

The electrical installations are the responsibility of Elkoll i Kiruna AB, which has chosen cable ladder solutions from MP bolagen for the project.

The delivery included cable ladders in widths ranging from 150 to 600 mm, in both stainless, acid-resistant, and Z4 versions. The installation consisted of both reinforced and standard designs to meet the varying requirements of the water treatment facility.

Project information

Customer: Elkoll AB

Location: Kiruna

Year: 2026

"It always works well in practice, very versatile to install and modify to meet our requirements."
Tommy Styrman, Project Manager Elkoll

1.jpg

Material selection with high demands

The water treatment plant is a process environment where chemicals and high hygiene requirements impose specific demands on material selection.

The availability of stainless and acid-resistant cable ladders and associated details makes it possible to adapt the cable installation to the facility's conditions.

Elkoll has previous good experience with MP bolagen's products. In the project, the company has also used MP bolagen's batching, which has worked well.

1000032962 kopiera.jpg

Smooth assembly and close collaboration

For Elkoll, short delivery times and easy installation are important factors. The products should be easy to assemble and adapt to the needs of the installations, without compromising quality.

When project manager Tommy Styrman summarises the collaboration, he describes both the products and the relationship as:

"Simple, qualitative, and personal."

Tommy Styrman

image3.jpeg
image6.jpeg
image17.jpeg

Selection of products used in the project

C2
C2

Step splice

E No:

MP-number: 107S

C2

Wall bracket, light, 300 mm

E No:

MP-number: 754S

C4
C4

Wall bracket, 600 mm

E No:

MP-number: 176Z2

C4
C4

Universal washer

E No:

MP-number: 731Z4

C4

Angle bracket

E No:

MP-number: 900Z

C4

Would you like to know more about the project?

Contact me and I can give you more information.